Application No. 107484.
Application for a Permit Under The Provisions of the Environmental Management Act.
We, Chevron Canada Limited intend to submit this application to the Director to authorize the discharge of effluent associated with the construction of the Kitimat LNG Terminal Project (“Project”). The source of discharge is stormwater runoff from the Project Site and support areas.
The land upon which the project and its support areas will be situated and the discharge will occur is Bees Indian Reserve No. 6, District Lot 2578; Units 10, 20, 28, 29, 30, 38, 39, 40 Block J and Units 1, 2, 11, 12, 21, 22, 31, 32 Block K, 103-H-15 in Range 4, Coast District, located at Bish Cove and within the Bish Creek Watershed including the following watercourses and associated tributaries: Bish Creek, West Creek, Skoda Creek and Renegade Creek.
The maximum rate of effluent discharged from this project and support areas will vary based upon seasons and weather and may change as the Project is developed. The operating period for this project and support areas will be continuous. The characteristics of the stormwater runoff will be surface water runoff from precipitation, including snowmelt, that contains suspended sediment from earthworks and construction are as follows: Total Suspended Solids (maximum of 75 mg/L), Total Extractable Hydrocarbons (maximum of 15 mg/L) and pH (upper limit of 9.0). The types of treatment to be applied to the discharges are: erosion prevention and sedimentation control management practices and devices which may include sedimentation ponds, oil water separators, pH adjustment and flocculent addition.
Any person who may be adversely affected by the proposed stormwater discharge and wishes to provide relevant information may, within 30 days after the date of posting, publishing, service or display, send written comments to the applicant (Kitimat LNG, 369 City Centre, Kitimat BC V8C 1T6). Please forward a copy of all correspondence to the Regional Director, Environmental Protection, Ministry of Environment at 325-1011 4th Ave. Prince George, BC V2L 3H9. Alternatively, email comments to authorizations.north@gov.bc.ca and reference the applicant name, the location and/or the authorization number in the subject line. The identity of any respondents and the contents of anything submitted in relation to this application will become part of the public record.
Dated this 29th Day of March, 2018.
Contact person: Keith Vorland.
Telephone No. 1-844-800-0900. [ap19]
Application No. 368740
Application for a Permit Under The Provisions of the Environmental Management Act.
We, Lafarge Canada Inc. of 6509 Airport Road, Mississauga Ontario L4V1S7, intend to submit this amendment application to the Director to amend permit 1894. Issued in 1973, and last amended in 2013 it authorizes air emissions from a cement manufacturing plant.
The land upon which the facility is situated and the discharge will occur is at 9750 Shuswap Road, Kamloops, BC, within the City of Kamloops bordering with Thompson Nicola Regional District. The source(s) of discharge are dust collector baghouses. The amendment requests that the following conditions be changed:
1. Move emission point from Alumina Catalyst Storage Shed dust collector No. 3 to New location for Gypsum Granulator System and update Total Particulate Matter:
Maximum Discharge Rate |
Contaminant |
Limit and Units |
|
Existing Authorization |
99 m3/min |
Total Particulate Matter |
50 mg/m3 |
Change Requested |
400 m3/min |
Total Particulate Matter |
20 mg/m3 |
*Duration is 24 hrs/day
2. Total Particulate Matter from Clinker Silo No. 20:
Maximum Discharge Rate |
Contaminant |
Limit and Units |
|
Existing Authorization |
91 m3/min |
Total Particulate Matter |
50 mg/m3 |
Change Requested |
91 m3/min |
Total Particulate Matter |
20 mg/m3 |
*Duration is 24 hrs/day
3. All other discharges for Total Particulate Matter from 50 mg/m3 to 20 mg/m3.
4. The addition of a Natural Pozzolan (Pumice) Dryer:
Maximum Discharge Rate |
Contaminant |
Limit and Units |
1200 m3/min |
Total Particulate Matter |
20 mg/m3 |
*Duration is 24 hrs/day
Any person who may be adversely affected by the proposed discharge of waste and wishes to provide relevant information may have until April 30, 2018 to send written comments to the applicant, with a copy to Ministry of Environment and Climate Change Strategy, Environmental Protection Division at 102 Industrial Place, Penticton, BC, V2A 7C8 or by email: Authorizations.South@gov.bc.ca. The identity of any respondents and the contents of anything submitted in relation to this application will become part of the public record.
Dated this 30th day of March, 2018.
Contact person: Stephanie Voysey,
2300 Rogers Avenue, Coquitlam, BC V3K 5X6.
Stephanie.voysey@lafargeholcim.com
Phone No.: 604-777-8049. [ap19]