Copyright (c) Queen's Printer, Victoria, British Columbia, Canada |
Licence Disclaimer |
||
|
Take notice that Petro-Canada intends to make application on or after October 30th, 2008, to the Oil and Gas Commission (Pipelines and Facilities, Safety Engineering Group and Applications and Approvals Branch) for leave to construct a 152.4mm pipeline in a 15.0m wide right of way in the Gunnell field for the purpose of transporting sour gas from the proposed facility site within Unit 13, Block A, Group 94-P-4 to wellsite c-71-I, 94-I-13, Peace River District.
Comments regarding this project may be directed to 150 Sixth Avenue, SW Calgary, AB T2P 3E3, telephone 1 403 296-5924, attention: Kourosh Kazemi. [no6]
Take notice that Unconventional Gas Resources Canada Operating Inc. intends to make application on or after October, 2008, to the Oil and Gas Commission (Pipelines and Facilities, Safety Engineering Group and Project Assessment Branch) for leave to construct a pipeline in the Town field, on Crown land from wellsite d-14-K/94-B-16 to tie into ProEx pipeline all within Block K, 94-B-16 for the purpose of transporting natural gas.
Comments regarding this project may be directed to Altec Inspection, Fort St John, BC, telephone 250 785-6295 or 250 785-5295. [no6]