Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc

"Point in Time" Regulation Content

Assessment Act

Electrical Power Corporations Valuation Regulation

B.C. Reg. 217/86

NOTE: Links below go to regulation content as it was prior to the changes made on the effective date. (PIT covers changes made from September 19, 2009 to "current to" date of the regulation.)
SECTIONEFFECTIVE DATE
Section 2 December 17, 2010
December 5, 2011
December 7, 2012
December 11, 2013
December 10, 2014
December 23, 2015
December 19, 2016
December 20, 2017
December 14, 2018
December 18, 2019
December 21, 2020
December 1, 2021
December 1, 2022
December 1, 2023
Section 3 December 17, 2010
December 5, 2011
December 7, 2012
December 11, 2013
December 19, 2016
December 20, 2017
December 14, 2018
December 18, 2019
December 21, 2020
December 1, 2021
December 1, 2022
December 1, 2023
Section 4 December 17, 2010
December 5, 2011
December 7, 2012
December 11, 2013
December 19, 2016
December 20, 2017
December 14, 2018
December 18, 2019
December 21, 2020
December 1, 2021
December 1, 2022
December 1, 2023
Section 5 December 19, 2016
Section 6 December 19, 2016
Section 8 December 17, 2010
December 20, 2017
December 21, 2020
Appendix A December 17, 2010
December 5, 2011
December 7, 2012
December 11, 2013
December 10, 2014
December 23, 2015
December 19, 2016
December 20, 2017
December 14, 2018
December 18, 2019
December 21, 2020
December 1, 2021
December 1, 2022
December 1, 2023

 Section 2 BEFORE amended by BC Reg 370/2010, effective December 17, 2010.

 Application

2  This regulation shall be used for determinations of value for the purposes of assessment for the 2008 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1.]

 Section 2 BEFORE amended by BC Reg 219/2011, effective December 5, 2011.

 Application

2  This regulation shall be used for determinations of value for the purposes of assessment for the 2011 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1.]

 Section 2 BEFORE amended by BC Reg 393/2012, effective December 7, 2012.

 Application

2  This regulation shall be used for determinations of value for the purposes of assessment for the 2012 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1.]

 Section 2 BEFORE amended by BC Reg 250/2013, effective December 11, 2013.

 Application

2  This regulation shall be used for determinations of value for the purposes of assessment for the 2013 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1.]

 Section 2 BEFORE amended by BC Reg 230/2014, effective December 10, 2014.

Application

2   This regulation shall be used for determinations of value for the purposes of assessment for the 2014 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1.]

 Section 2 BEFORE amended by BC Reg 261/2015, effective December 23, 2015.

Application

2   This regulation shall be used for determinations of value for the purposes of assessment for the 2015 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1; 230/2014, s. 1.]

 Section 2 BEFORE amended by BC Reg 314/2016, effective December 19, 2016.

Application

2   This regulation shall be used for determinations of value for the purposes of assessment for the 2016 and subsequent taxation years.

 Section 2 BEFORE amended by BC Reg 244/2017, effective December 20, 2017.

Application

2   This regulation must be used for determinations of value for the purposes of assessment for the 2017 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1; 230/2014, s. 1; 261/2015, s.1; 314/2016, s. 1.]

 Section 2 BEFORE amended by BC Reg 279/2018, effective December 14, 2018.

Application

2   This regulation must be used for determinations of value for the purposes of assessment for the 2018 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1; 230/2014, s. 1; 261/2015, s. 1; 314/2016, s. 1; 244/2017, s. 1.]

 Section 2 BEFORE amended by BC Reg 281/2019, effective December 18, 2019.

Application

2   This regulation must be used for determinations of value for the purposes of assessment for the 2019 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1; 230/2014, s. 1; 261/2015, s. 1; 314/2016, s. 1; 244/2017, s. 1; 279/2018, s. 1.]

 Section 2 BEFORE amended by BC Reg 298/2020, effective December 21, 2020.

Application

2   This regulation must be used for determinations of value for the purposes of assessment for the 2020 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1; 230/2014, s. 1; 261/2015, s. 1; 314/2016, s. 1; 244/2017, s. 1; 279/2018, s. 1; 281/2019, s. 1.]

 Section 2 BEFORE amended by BC Reg 313/2021, effective December 1, 2021.

Application

2   This regulation must be used for determinations of value for the purposes of assessment for the 2021 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1; 230/2014, s. 1; 261/2015, s. 1; 314/2016, s. 1; 244/2017, s. 1; 279/2018, s. 1; 281/2019, s. 1; 298/2020, s. 1.]

 Section 2 BEFORE amended by BC Reg 259/2022, effective December 1, 2022.

Application

2   This regulation must be used for determinations of value for the purposes of assessment for the 2022 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1; 230/2014, s. 1; 261/2015, s. 1; 314/2016, s. 1; 244/2017, s. 1; 279/2018, s. 1; 281/2019, s. 1; 298/2020, s. 1; 313/2021, s. 1.]

 Section 2 BEFORE amended by BC Reg 249/2023, effective December 1, 2023.

Application

2   This regulation must be used for determinations of value for the purposes of assessment for the 2023 and subsequent taxation years.

[en. B.C. Reg. 452/92, s. 1; am. B.C. Regs. 414/93, s. 1; 455/94, s. 1; 334/96, s. 1; 339/97, s. 1; 339/98, s. 1; 424/99, s. 1; 314/2000, s. 1; 280/2001, s. 1; 360/2002, s. 1; 487/2003, s. 1; 375/2005, s. 1; 364/2006, s. 1; 348/2007, s. 1; 370/2010, s. 1; 219/2011, s. 1; 393/2012, Sch. s. 1; 250/2013, s. 1; 230/2014, s. 1; 261/2015, s. 1; 314/2016, s. 1; 244/2017, s. 1; 279/2018, s. 1; 281/2019, s. 1; 298/2020, s. 1; 313/2021, s. 1; 259/2022, s. 1.]

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 370/2010, effective December 17, 2010.

(a) Class 1, $32 600 per circuit kilometre;

(b) Class 2, $23 500 per circuit kilometre;

(c) Class 3, $17 300 per circuit kilometre;

(d) Class 4, $5 800 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 219/2011, effective December 5, 2011.

(a) Class 1, $34 600 per circuit kilometre;

(b) Class 2, $24 900 per circuit kilometre;

(c) Class 3, $18 300 per circuit kilometre;

(d) Class 4, $6 100 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 393/2012, effective December 7, 2012.

(a) Class 1, $35 200 per circuit kilometre;

(b) Class 2, $25 300 per circuit kilometre;

(c) Class 3, $18 600 per circuit kilometre;

(d) Class 4, $6 200 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 250/2013, effective December 11, 2013.

(a) Class 1, $36 400 per circuit kilometre;

(b) Class 2, $26 200 per circuit kilometre;

(c) Class 3, $19 300 per circuit kilometre;

(d) Class 4, $6 400 per circuit kilometre.

 Section 3 (2) BEFORE amended by BC Reg 314/2016, effective December 19, 2016.

(2) Subject to section 5, the actual value of electrical power distribution lines of an electric power corporation shall be determined using the following rates:

(a) Class 1, $37 100 per circuit kilometre;

(b) Class 2, $26 700 per circuit kilometre;

(c) Class 3, $19 700 per circuit kilometre;

(d) Class 4, $6 500 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 244/2017, effective December 20, 2017.

(a) Class 1, $38 000 per circuit kilometre;

(b) Class 2, $27 400 per circuit kilometre;

(c) Class 3, $20 200 per circuit kilometre;

(d) Class 4, $6 700 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 279/2018, effective December 14, 2018.

(a) Class 1, $38 400 per circuit kilometre;

(b) Class 2, $27 700 per circuit kilometre;

(c) Class 3, $20 400 per circuit kilometre;

(d) Class 4, $6 800 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 281/2019, effective December 18, 2019.

(a) Class 1, $39 700 per circuit kilometre;

(b) Class 2, $28 600 per circuit kilometre;

(c) Class 3, $21 100 per circuit kilometre;

(d) Class 4, $7 000 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 298/2020, effective December 21, 2020.

(a) Class 1, $41 300 per circuit kilometre;

(b) Class 2, $29 700 per circuit kilometre;

(c) Class 3, $21 900 per circuit kilometre;

(d) Class 4, $7 300 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 313/2021, effective December 1, 2021.

(a) Class 1, $42 400 per circuit kilometre;

(b) Class 2, $30 500 per circuit kilometre;

(c) Class 3, $22 500 per circuit kilometre;

(d) Class 4, $7 500 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 259/2022, effective December 1, 2022.

(a) Class 1, $42 800 per circuit kilometre;

(b) Class 2, $30 800 per circuit kilometre;

(c) Class 3, $22 700 per circuit kilometre;

(d) Class 4, $7 600 per circuit kilometre.

 Section 3 (2) (a) to (d) BEFORE amended by BC Reg 249/2023, effective December 1, 2023.

(a) "Class 1 electric power distribution lines" means the distribution lines of an electrical power corporation in a municipality that has a population, as of the 1981 Census of Canada, of 30 000 persons or greater, and has a parcel density of not less than 0.5 per acre,

(b) "Class 2 electric power distribution lines" means the distribution lines of an electrical power corporation in a municipality, other than those referred to in Class 1,

(c) "Class 3 electric power distribution lines" means the distribution lines of an electrical power corporation outside a municipality, and

(d) "Class 4 electric power distribution lines" means the additional conductors, insulators and supporting structures which have been installed on the towers or poles of a previously constructed line.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 370/2010, effective December 17, 2010.

(a) Class 1, $42 800 per circuit kilometre;

(b) Class 2, $54 400 per circuit kilometre;

(c) Class 3, $554 900 per circuit kilometre;

(d) Class 4, $422 100 per circuit kilometre;

(e) Class 5, $535 300 per circuit kilometre;

(f) Class 6, $328 100 per circuit kilometre;

(g) Class 7, $86 100 per circuit kilometre;

(h) Class 8, $95 000 per circuit kilometre;

(i) Class 9, $233 900 per circuit kilometre;

(j) Class 10, $293 800 per circuit kilometre;

(k) Class 11, $4 981 900 per circuit kilometre;

(l) Class 12, $31 100 per circuit kilometre;

(m) Class 13, $85 500 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 219/2011, effective December 5, 2011.

(a) Class 1, $45 400 per circuit kilometre;

(b) Class 2, $57 800 per circuit kilometre;

(c) Class 3, $596 700 per circuit kilometre;

(d) Class 4, $453 900 per circuit kilometre;

(e) Class 5, $575 700 per circuit kilometre;

(f) Class 6, $352 800 per circuit kilometre;

(g) Class 7, $91 400 per circuit kilometre;

(h) Class 8, $100 900 per circuit kilometre;

(i) Class 9, $251 500 per circuit kilometre;

(j) Class 10, $315 900 per circuit kilometre;

(k) Class 11, $5 330 600 per circuit kilometre;

(l) Class 12, $33 200 per circuit kilometre;

(m) Class 13, $91 400 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 393/2012, effective December 7, 2012.

(a) Class 1, $46 700 per circuit kilometre;

(b) Class 2, $59 500 per circuit kilometre;

(c) Class 3, $614 600 per circuit kilometre;

(d) Class 4, $467 500 per circuit kilometre;

(e) Class 5, $592 900 per circuit kilometre;

(f) Class 6, $363 300 per circuit kilometre;

(g) Class 7, $94 100 per circuit kilometre;

(h) Class 8, $103 900 per circuit kilometre;

(i) Class 9, $259 000 per circuit kilometre;

(j) Class 10, $325 300 per circuit kilometre;

(k) Class 11, $5 490 500 per circuit kilometre;

(l) Class 12, $34 100 per circuit kilometre;

(m) Class 13, $94 100 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 250/2013, effective December 11, 2013.

(a) Class 1, $48 600 per circuit kilometre;

(b) Class 2, $61 900 per circuit kilometre;

(c) Class 3, $639 200 per circuit kilometre;

(d) Class 4, $486 200 per circuit kilometre;

(e) Class 5, $616 600 per circuit kilometre;

(f) Class 6, $377 800 per circuit kilometre;

(g) Class 7, $97 900 per circuit kilometre;

(h) Class 8, $108 100 per circuit kilometre;

(i) Class 9, $269 400 per circuit kilometre;

(j) Class 10, $338 300 per circuit kilometre;

(k) Class 11, $5 710 100 per circuit kilometre;

(l) Class 12, $35 500 per circuit kilometre;

(m) Class 13, $97 900 per circuit kilometre.

 Section 4 (2) BEFORE amended by BC Reg 314/2016, effective December 19, 2016.

(2) Subject to section 5, the actual value of electrical power transmission lines of an electric power corporation shall be determined using the following rates:

(a) Class 1, $49 600 per circuit kilometre;

(b) Class 2, $63 100 per circuit kilometre;

(c) Class 3, $652 000 per circuit kilometre;

(d) Class 4, $495 900 per circuit kilometre;

(e) Class 5, $628 900 per circuit kilometre;

(f) Class 6, $385 400 per circuit kilometre;

(g) Class 7, $99 900 per circuit kilometre;

(h) Class 8, $110 300 per circuit kilometre;

(i) Class 9, $274 800 per circuit kilometre;

(j) Class 10, $345 100 per circuit kilometre;

(k) Class 11, $5 824 300 per circuit kilometre;

(l) Class 12, $36 200 per circuit kilometre;

(m) Class 13, $99 900 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 244/2017, effective December 20, 2017.

(a) Class 1, $50 800 per circuit kilometre;

(b) Class 2, $64 700 per circuit kilometre;

(c) Class 3, $668 300 per circuit kilometre;

(d) Class 4, $508 300 per circuit kilometre;

(e) Class 5, $644 600 per circuit kilometre;

(f) Class 6, $395 000 per circuit kilometre;

(g) Class 7, $102 400 per circuit kilometre;

(h) Class 8, $113 100 per circuit kilometre;

(i) Class 9, $281 700 per circuit kilometre;

(j) Class 10, $353 700 per circuit kilometre;

(k) Class 11, $5 969 900 per circuit kilometre;

(l) Class 12, $37 100 per circuit kilometre;

(m) Class 13, $102 400 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 279/2018, effective December 14, 2018.

(a) Class 1, $51 300 per circuit kilometre;

(b) Class 2, $65 300 per circuit kilometre;

(c) Class 3, $675 000 per circuit kilometre;

(d) Class 4, $513 400 per circuit kilometre;

(e) Class 5, $651 000 per circuit kilometre;

(f) Class 6, $399 000 per circuit kilometre;

(g) Class 7, $103 400 per circuit kilometre;

(h) Class 8, $114 200 per circuit kilometre;

(i) Class 9, $284 500 per circuit kilometre;

(j) Class 10, $357 200 per circuit kilometre;

(k) Class 11, $6 029 600 per circuit kilometre;

(l) Class 12, $37 500 per circuit kilometre; and

(m) Class 13, $103 400 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 281/2019, effective December 18, 2019.

(a) Class 1, $52 600 per circuit kilometre;

(b) Class 2, $67 000 per circuit kilometre;

(c) Class 3, $692 400 per circuit kilometre;

(d) Class 4, $526 600 per circuit kilometre;

(e) Class 5, $667 800 per circuit kilometre;

(f) Class 6, $409 300 per circuit kilometre;

(g) Class 7, $106 100 per circuit kilometre;

(h) Class 8, $117 100 per circuit kilometre;

(i) Class 9, $291 800 per circuit kilometre;

(j) Class 10, $366 400 per circuit kilometre;

(k) Class 11, $6 185 200 per circuit kilometre;

(l) Class 12, $38 500 per circuit kilometre;

(m) Class 13, $106 100 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 298/2020, effective December 21, 2020.

(a) Class 1, $54 500 per circuit kilometre;

(b) Class 2, $69 500 per circuit kilometre;

(c) Class 3, $709 700 per circuit kilometre;

(d) Class 4, $539 700 per circuit kilometre;

(e) Class 5, $684 500 per circuit kilometre;

(f) Class 6, $419 500 per circuit kilometre;

(g) Class 7, $110 000 per circuit kilometre;

(h) Class 8, $121 400 per circuit kilometre;

(i) Class 9, $299 100 per circuit kilometre;

(j) Class 10, $375 500 per circuit kilometre;

(k) Class 11, $6 339 500 per circuit kilometre;

(l) Class 12, $39 500 per circuit kilometre;

(m) Class 13, $108 700 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 313/2021, effective December 1, 2021.

(a) Class 1, $56 200 per circuit kilometre;

(b) Class 2, $71 700 per circuit kilometre;

(c) Class 3, $742 800 per circuit kilometre;

(d) Class 4, $564 900 per circuit kilometre;

(e) Class 5, $716 400 per circuit kilometre;

(f) Class 6, $439 100 per circuit kilometre;

(g) Class 7, $113 400 per circuit kilometre;

(h) Class 8, $125 200 per circuit kilometre;

(i) Class 9, $313 000 per circuit kilometre;

(j) Class 10, $393 000 per circuit kilometre;

(k) Class 11, $6 635 000 per circuit kilometre;

(l) Class 12, $41 300 per circuit kilometre;

(m) Class 13, $113 800 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 259/2022, effective December 1, 2022.

(a) Class 1, $57 000 per circuit kilometre;

(b) Class 2, $72 700 per circuit kilometre;

(c) Class 3, $753 900 per circuit kilometre;

(d) Class 4, $573 400 per circuit kilometre;

(e) Class 5, $727 100 per circuit kilometre;

(f) Class 6, $445 700 per circuit kilometre;

(g) Class 7, $115 000 per circuit kilometre;

(h) Class 8, $127 000 per circuit kilometre;

(i) Class 9, $317 700 per circuit kilometre;

(j) Class 10, $398 900 per circuit kilometre;

(k) Class 11, $6 734 600 per circuit kilometre;

(l) Class 12, $41 900 per circuit kilometre;

(m) Class 13, $115 500 per circuit kilometre.

 Section 4 (2) (a) to (m) BEFORE amended by BC Reg 249/2023, effective December 1, 2023.

(a) Class 1, $60 700 per circuit kilometre;

(b) Class 2, $77 400 per circuit kilometre;

(c) Class 3, $800 800 per circuit kilometre;

(d) Class 4, $609 000 per circuit kilometre;

(e) Class 5, $772 300 per circuit kilometre;

(f) Class 6, $473 400 per circuit kilometre;

(g) Class 7, $122 500 per circuit kilometre;

(h) Class 8, $135 200 per circuit kilometre;

(i) Class 9, $337 400 per circuit kilometre;

(j) Class 10, $423 700 per circuit kilometre;

(k) Class 11, $7 153 200 per circuit kilometre;

(l) Class 12, $44 500 per circuit kilometre;

(m) Class 13, $122 700 per circuit kilometre.

 Section 5 BEFORE amended by BC Reg 314/2016, effective December 19, 2016.

Electrical power corporation special cases

5   (1) Where, in respect of an electrical transmission or distribution line referred to in section 21 (1) (a) of the Assessment Act,

(a) a senior executive of the corporation provides the assessment authority with documentation certifying that the cable has been properly abandoned, and

(b) the transmission or distribution line would, if valued under section 19 of the Assessment Act and in that reference to section 21 of the Assessment Act, have no value,

the actual value of the transmission or distribution line shall be determined using a rate of one dollar.

(2) Where, in respect of an electrical power transmission or distribution line which remains in place but for any reason has not been utilized for a period of one year or more, the actual value shall be determined by applying 10% of the rate prescribed for its class.

 Section 6 BEFORE amended by BC Reg 314/2016, effective December 19, 2016.

Electrical power lines under construction

6   Where an electrical power transmission or distribution line referred to in section 21 (1) (a) of the Assessment Act is under construction, the assessor shall determine the percentage complete as of October 31 and the actual value of the line shall be determined by applying the percentage complete to the rate prescribed for that class.

 Section 8 BEFORE repealed by BC Reg 370/2010, effective December 17, 2010.

 Phase-in of rates

8  Pursuant to section 21 (4.1) of the Assessment Act, the assessment commissioner being of the opinion that the rates for valuing improvements under Appendix A of this regulation have changed substantially for the 2006 tax year from the rates for the 2005 tax year, the rates that would have been in effect for the 2006 tax year will be phased in equally over 3 years.

[en. B.C. Reg. 375/2005, s. 3.]

 Section 8 was enacted by BC Reg 244/2017, effective December 20, 2017.

 Section 8 BEFORE repealed by BC Reg 298/2020, effective December 21, 2020.

Phase-in of rates

8   For the purposes of section 21 (4.1) of the Assessment Act, the rates referred to in section 7 of this regulation, that would be used to determine the actual value of a tower for the 2018 taxation year, are to be phased in equally over 3 years.

[en. B.C. Reg. 244/2017, s. 4.]

 Appendix A BEFORE re-enacted by BC Reg 370/2010, effective December 17, 2010.

Appendix A

[en. B.C. Reg. 348/2007, s. 4.]

Communication towers — Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, P.S.T. and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

GUYED TOWERS (Triangular Base)
Low Cost Guyed Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
and
over
       
11" and under side dimension$80$80$80$90$90$100$100~~~~~~~
12" to 14" side dimension$ 90$ 90$ 90$100$100$110$120~~~~~~~
15" to 17" side dimension$120$120$120$120$130$130$130~~~~~~~
18" to 23" side dimension$140$130$130$140$140$150$160~~~~~~~
24" to 29" side dimension$160$160$160$170$170$180$190~~~~~~~
30" and over side dimension$210$200$200$200$210$220$230~~~~~~~
Guyed Towers
(CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
11" and under side dimension$110$140$150$160$160$170$170$170$180$180$180$180$180$180
12" to 14" side dimension$130$160$180$190$200$200$210$210$210$210$220$220$220$220
15" to 17" side dimension$190$210$220$230$230$240$240$240$240$240$240$240$250$250
18" to 23" side dimension$220$240$240$250$250$250$250$260$260$260$260$260$260$260
24" to 29" side dimension$290$300$310$310$320$320$320$330$330$330$340$340$340$340
30" to 35" side dimension$330$360$370$380$380$390$390$390$390$400$400$400$400$400
36" to 39" side dimension$380$410$420$430$440$440$440$440$450$450$450$450$450$450
40" to 47" side dimension$440$460$460$460$470$470$470$470$470$470$470$470$470$470
48" to 53" side dimension$500$520$540$540$550$550$560$560$560$560$560$560$560$560
54" and over side dimension$610$610$610$610$610$610$610$620$620$620$620$620$620$630

Note: For stepped towers, the rate per foot for each section will be based on the total overall height of the tower.

SELF SUPPORTED TOWERS (Triangular Base)
Low Cost Self Supported Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
and
over
         
Light Weight$90$90$100$110$130~~~~~~~~~
Medium Weight$100$100$110$130$140~~~~~~~~~
Heavy Weight$160$140$150$160$170~~~~~~~~~
Self Supported Towers
(CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
Light Weight - No Platform$250$210$230$260$300$350$400$440$500$550$610$660$710$770
Medium Weight - 1 Platform$300$310$350$390$440$490$530$590$630$690$740$790$850$900
Heavy Weight - 2 or 3 Platforms$350$410$460$520$570$620$680$720$780$830$870$930$970$1 030
MONOPOLES
Height in Feet59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
and
over
     
Monopoles, Stepped Pole
- No Platform
$240$260$300$350$410$460$520$580$630~~~~~
Monopoles, Stepped Pole
- 1 Platform
$440$400$410$440$470$520$570$620$680~~~~~
Monopoles, Tapered Pole
- No Platform
$280$320$370$440$500$570$630$700$780~~~~~
Monopoles, Tapered Pole
- 1 Platform
$490$450$470$520$570$620$690$750$820~~~~~
Each additional platform for monopoles (regardless of tower height)$10 490
SUPPORT STRUCTURES AND CUSTOM TOWERS for
Radomes, Heavily Loaded Microwave Facilities and Passive Repeaters, etc.
Structure Frame
(including foundations)
Rate per cubic foot based on the volume enclosed within the exterior members of each frame.
For passive repeaters, do not measure framing in the reflector or between reflector and support structure.
All sizes
$7.00 Per Cubic Foot

 Appendix A (part) BEFORE amended by BC Reg 219/2011, effective December 5, 2011.

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, P.S.T. and Owner's Costs.

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, P.S.T. and Owner's Costs.

 Appendix A BEFORE re-enacted by BC Reg 393/2012, effective December 7, 2012.

Appendix A

[en. B.C. Reg. 370/2010, s. 5; am. B.C. Reg. 219/2011, s. 4.]

Communication towers — Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, H.S.T. and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

GUYED TOWERS (Triangular Base)
Low Cost Guyed Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
and
over
       
11" and under side dimension$ 80$ 80$ 80$ 90$ 90$100$100~~~~~~~
12" to 14" side dimension$ 90$ 90$ 90$100$100$110$130~~~~~~~
15" to 17" side dimension$130$130$130$130$140$140$140~~~~~~~
18" to 23" side dimension$150$140$140$150$150$160$170~~~~~~~
24" to 29" side dimension$170$170$170$180$180$190$200~~~~~~~
30" and over side dimension$220$210$210$210$220$230$250~~~~~~~
Guyed Towers (CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
11" and under side dimension$110$150$160$170$170$180$180$180$190$190$190$190$190$190
12" to 14" side dimension$140$170$190$200$210$210$220$220$220$220$230$230$230$230
15" to 17" side dimension$200$220$230$250$250$260$260$260$260$260$260$260$270$270
18" to 23" side dimension$230$260$260$270$270$270$270$280$280$280$280$280$280$280
24" to 29" side dimension$310$320$330$330$340$340$340$350$350$350$360$360$360$360
30" to 35" side dimension$350$390$400$410$410$420$420$420$420$430$430$430$430$430
36" to 39" side dimension$410$440$450$460$470$470$470$470$480$480$480$480$480$480
40" to 47" side dimension$470$490$490$490$510$510$510$510$510$510$510$510$510$510
48" to 53" side dimension$540$560$580$580$590$590$600$600$600$600$600$600$600$600
54" and over side dimension$660$660$660$660$660$660$660$670$670$670$670$670$670$680

Note: For stepped towers, the rate per foot for each section will be based on the total overall height of the tower.

SELF SUPPORTED TOWERS (Triangular Base)
Low Cost Self Supported Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
and
over
         
Light Weight$ 90$ 90$100$110$140~~~~~~~~~
Medium Weight$100$100$110$140$150~~~~~~~~~
Heavy Weight$170$150$160$170$180~~~~~~~~~
Self Supported Towers
(CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
Light Weight – No Platform$270$220$250$280$320$380$430$470$540$590$660$710$770$830
Medium Weight – 1 Platform$320$330$380$420$470$530$570$640$680$740$800$850$920$970
Heavy Weight – 2 or 3 Platforms$380$440$490$560$610$670$730$780$840$900$940$1 000$1 050$1 110

Communication towers – Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, H.S.T. and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

MONOPOLES
Height in Feet59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
and
over
     
Monopoles, Stepped Pole – No Platform$260$280$320$380$440$490$560$620$680~~~~~
Monopoles, Stepped Pole – 1 Platform$470$430$440$470$510$560$610$670$730~~~~~
Monopoles, Tapered Pole – No Platform$300$340$400$470$540$610$680$760$840~~~~~
Monopoles, Tapered Pole – 1 Platform$530$480$510$560$610$670$740$810$890~~~~~
Each additional platform for monopoles (regardless of tower height)$11 380
SUPPORT STRUCTURES AND CUSTOM TOWERS for
Radomes, Heavily Loaded Microwave Facilities and Passive Repeaters, etc.
Structure Frame
(including foundations)
Rate per cubic foot based on the volume enclosed within the exterior members of each frame.All sizes;
For passive repeaters, do not measure framing in the reflector or between reflector and support structure.$7.00 per cubic foot

 Appendix A BEFORE re-enacted by BC Reg 250/2013, effective December 11, 2013.

Appendix A

[en. B.C. Reg. 393/2012, Sch. s. 4.]

Communication towers — Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner’s Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

GUYED TOWERS (Triangular Base)
Low Cost Guyed Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
and
over
       
11" and under side dimension$ 82$ 82$ 82$ 93$ 93$103$103~~~~~~~
12" to 14" side dimension$ 93$ 93$ 93$103$103$113$134~~~~~~~
15" to 17" side dimension$134$134$134$134$144$144$144~~~~~~~
18" to 23" side dimension$155$144$144$155$155$165$175~~~~~~~
24" to 29" side dimension$175$175$175$185$185$196$206~~~~~~~
30" and over side dimension$227$216$216$216$227$237$258~~~~~~~
Guyed Towers (CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
11" and under side dimension$113$155$165$175$175$185$185$185$196$196$196$196$196$196
12" to 14" side dimension$144$175$196$206$216$216$227$227$227$227$237$237$237$237
15" to 17" side dimension$206$227$237$258$258$268$268$268$268$268$268$268$278$278
18" to 23" side dimension$237$268$268$278$278$278$278$288$288$288$288$288$288$288
24" to 29" side dimension$319$330$340$340$350$350$350$361$361$361$371$371$371$371
30" to 35" side dimension$361$402$412$422$422$433$433$433$433$443$443$443$443$443
36" to 39" side dimension$422$453$464$474$484$484$484$484$494$494$494$494$494$494
40" to 47" side dimension$484$505$505$505$525$525$525$525$525$525$525$525$525$525
48" to 53" side dimension$556$577$597$597$608$608$618$618$618$618$618$618$618$618
54" and over side dimension$680$680$680$680$680$680$680$690$690$690$690$690$690$700

Note: For stepped towers, the rate per foot for each section will be based on the total overall height of the tower.

SELF SUPPORTED TOWERS (Triangular Base)
Low Cost Self Supported Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
and
over
         
Light Weight$ 93$ 93$103$113$144~~~~~~~~~
Medium Weight$103$103$113$144$155~~~~~~~~~
Heavy Weight$175$155$165$175$185~~~~~~~~~
Self Supported Towers
(CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
Light Weight – No Platform$278$227$258$288$330$391$443$484$556$608$680$731$793$855
Medium Weight – 1 Platform$330$340$391$433$484$546$587$659$700$762$824$876$948$999
Heavy Weight – 2 or 3 Platforms$391$453$505$577$628$690$752$803$865$927$968$1 030$1 082$1 143

Communication towers – Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

MONOPOLES
Height in Feet59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
and
over
     
Monopoles, Stepped Pole – No Platform$268$288$330$391$453$505$577$639$700~~~~~
Monopoles, Stepped Pole – 1 Platform$484$443$453$484$525$577$628$690$752~~~~~
Monopoles, Tapered Pole – No Platform$309$350$412$484$556$628$700$783$865~~~~~
Monopoles, Tapered Pole – 1 Platform$546$494$525$577$628$690$762$834$917~~~~~
Each additional platform for monopoles (regardless of tower height)$11 721
SUPPORT STRUCTURES AND CUSTOM TOWERS for
Radomes, Heavily Loaded Microwave Facilities and Passive Repeaters, etc.
Structure Frame
(including foundations)
Rate per cubic foot based on the volume enclosed within the exterior members of each frame.All sizes;
For passive repeaters, do not measure framing in the reflector or between reflector and support structure.$7.00 per cubic foot

 Appendix A BEFORE amended by BC Reg 230/2014, effective December 10, 2014.

Appendix A

[en. B.C. Reg. 250/2013, s. 4.]

Communication towers — Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

GUYED TOWERS (Triangular Base)
Low Cost Guyed Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
and
over
       
11" and under side dimension$ 84$ 84$ 84$ 95$ 95$105$105~~~~~~~
12" to 14" side dimension$ 95$ 95$ 95$105$105$115$137~~~~~~~
15" to 17" side dimension$137$137$137$137$147$147$147~~~~~~~
18" to 23" side dimension$158$147$147$158$158$168$179~~~~~~~
24" to 29" side dimension$179$179$179$189$189$200$210~~~~~~~
30" and over side dimension$232$220$220$220$232$242$263~~~~~~~
Guyed Towers (CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
11" and under side dimension$115$158$168$179$179$189$189$189$200$200$200$200$200$200
12" to 14" side dimension$147$179$200$210$220$220$232$232$232$232$242$242$242$242
15" to 17" side dimension$210$232$242$263$263$273$273$273$273$273$273$273$284$284
18" to 23" side dimension$242$273$273$284$284$284$284$294$294$294$294$294$294$294
24" to 29" side dimension$325$337$347$347$357$357$357$368$368$368$378$378$378$378
30" to 35" side dimension$368$410$420$430$430$442$442$442$442$452$452$452$452$452
36" to 39" side dimension$430$462$473$483$494$494$494$494$504$504$504$504$504$504
40" to 47" side dimension$494$515$515$515$536$536$536$536$536$536$536$536$536$536
48" to 53" side dimension$567$589$609$609$620$620$630$630$630$630$630$630$630$630
54" and over side dimension$694$694$694$694$694$694$694$704$704$704$704$704$704$714

Note: For stepped towers, the rate per foot for each section will be based on the total overall height of the tower.

SELF SUPPORTED TOWERS (Triangular Base)
Low Cost Self Supported Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
and
over
         
Light Weight$ 95$ 95$105$115$147~~~~~~~~~
Medium Weight$105$105$115$147$158~~~~~~~~~
Heavy Weight$179$158$168$179$189~~~~~~~~~
Self Supported Towers
(CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
Light Weight – No Platform$284$232$263$294$337$399$452$494$567$620$694$746$809$872
Medium Weight – 1 Platform$337$347$399$442$494$557$599$672$714$777$840$894$967$1 019
Heavy Weight – 2 or 3 Platforms$399$462$515$589$641$704$767$819$882$946$987$1 051$1 104$1 166

Communication Towers – Installed Rates Per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

MONOPOLES
Height in Feet59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
and
over
    
Monopoles, Stepped Pole – No Platform$273$294$337$399$462$515$589$652$714~~~~
Monopoles, Stepped Pole – 1 Platform$494$452$462$494$536$589$641$704$767~~~~
Monopoles, Tapered Pole – No Platform$315$357$420$494$567$641$714$799$882~~~~
Monopoles, Tapered Pole – 1 Platform$557$504$536$589$641$704$777$851$935~~~~
Each additional platform for monopoles (regardless of tower height)$11 995
SUPPORT STRUCTURES & CUSTOM TOWERS for
Radomes, Heavily Loaded Microwave Facilities and Passive Repeaters, Etc.
Structure Frame
(Including foundations)
Rate per cubic foot based on the volume enclosed within the exterior members of each frame.All Sizes
For passive repeaters, do not measure framing in the reflector or between reflector and support structure.$7.00 Per Cu. Ft.

 Appendix A BEFORE re-enacted by BC Reg 261/2015, effective December 23, 2015.

Appendix A

[en. B.C. Reg. 230/2014, s. 2.]

Communication towers — Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

GUYED TOWERS (Triangular Base)
Low Cost Guyed Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
and
over
       
11" and under side dimension$ 85$ 85$ 85$ 96$ 96$107$107~~~~~~~
12" to 14" side dimension$ 96$ 96$ 96$107$107$117$139~~~~~~~
15" to 17" side dimension$139$139$139$139$149$149$149~~~~~~~
18" to 23" side dimension$160$149$149$160$160$171$181~~~~~~~
24" to 29" side dimension$181$181$181$192$192$203$213~~~~~~~
30" and over side dimension$235$224$224$224$235$245$267~~~~~~~
Guyed Towers (CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
11" and under side dimension$117$160$171$181$181$192$192$192$203$203$203$203$203$203
12" to 14" side dimension$149$181$203$213$224$224$235$235$235$235$245$245$245$245
15" to 17" side dimension$213$235$245$267$267$277$277$277$277$277$277$277$288$288
18" to 23" side dimension$245$277$277$288$288$288$288$298$298$298$298$298$298$298
24" to 29" side dimension$330$342$352$352$362$362$362$374$374$374$384$384$384$384
30" to 35" side dimension$374$416$427$437$437$448$448$448$448$459$459$459$459$459
36" to 39" side dimension$437$469$480$491$501$501$501$501$511$511$511$511$511$511
40" to 47" side dimension$501$523$523$523$544$544$544$544$544$544$544$544$544$544
48" to 53" side dimension$576$597$618$618$629$629$640$640$640$640$640$640$640$640
54" and over side dimension$704$704$704$704$704$704$704$714$714$714$714$714$714$725

Note: For stepped towers, the rate per foot for each section will be based on the total overall height of the tower.

SELF SUPPORTED TOWERS (Triangular Base)
Low Cost Self Supported Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
and
over
         
Light Weight$ 96$ 96$107$117$149~~~~~~~~~
Medium Weight$107$107$117$149$160~~~~~~~~~
Heavy Weight$181$160$171$181$192~~~~~~~~~
Self Supported Towers
(CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
Light Weight – No Platform$288$235$267$298$342$405$459$501$576$629$704$757$821$885
Medium Weight – 1 Platform$342$352$405$448$501$565$608$682$725$789$853$907$981$1 034
Heavy Weight – 2 or 3 Platforms$405$469$523$597$650$714$779$831$896$960$1 002$1 066$1 120$1 183

Communication Towers – Installed Rates Per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

MONOPOLES
Height in Feet59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
and
over
    
Monopoles, Stepped Pole – No Platform$277$298$342$405$469$523$597$662$725~~~~
Monopoles, Stepped Pole – 1 Platform$501$459$469$501$544$597$650$714$779~~~~
Monopoles, Tapered Pole – No Platform$320$362$427$501$576$650$725$811$896~~~~
Monopoles, Tapered Pole – 1 Platform$565$511$544$597$650$714$789$863$949~~~~
Each additional platform for monopoles (regardless of tower height)$12 135
SUPPORT STRUCTURES & CUSTOM TOWERS for
Radomes, Heavily Loaded Microwave Facilities and Passive Repeaters, Etc.
Structure Frame
(Including foundations)
Rate per cubic foot based on the volume enclosed within the exterior members of each frame.All Sizes
For passive repeaters, do not measure framing in the reflector or between reflector and support structure.$7.00 Per Cu. Ft.

 Appendix A BEFORE re-enacted by BC Reg 314/2016, effective December 19, 2016.

Appendix A

[en. B.C. Reg. 261/2015, s. 2.]

Communication towers — Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

GUYED TOWERS (Triangular Base)
Low Cost Guyed Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
and
over
       
11" and under side dimension$87$87$87$98$98$109$109~~~~~~~
12" to 14" side dimension$98$98$98$109$109$119$142~~~~~~~
15" to 17" side dimension$142$142$142$142$152$152$152~~~~~~~
18" to 23" side dimension$164$152$152$164$164$174$185~~~~~~~
24" to 29" side dimension$185$185$185$195$195$207$218~~~~~~~
30" and over side dimension$240$228$228$228$240$250$272~~~~~~~
Guyed Towers (CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
11" and under side dimension$119$164$174$185$185$195$195$195$207$207$207$207$207$207
12" to 14" side dimension$152$185$207$218$228$228$240$240$240$240$250$250$250$250
15" to 17" side dimension$218$240$250$272$272$283$283$283$283$283$283$283$294$294
18" to 23" side dimension$250$283$283$294$294$294$294$304$304$304$304$304$304$304
24" to 29" side dimension$337$348$359$359$370$370$370$381$381$381$392$392$392$392
30" to 35" side dimension$381$425$435$446$446$457$457$457$457$468$468$468$468$468
36" to 39" side dimension$446$478$490$501$511$511$511$511$522$522$522$522$522$522
40" to 47" side dimension$511$533$533$533$554$554$554$554$554$554$554$554$554$554
48" to 53" side dimension$587$609$630$630$642$642$653$653$653$653$653$653$653$653
54" and over side dimension$718$718$718$718$718$718$718$729$729$729$729$729$729$739

Note: For stepped towers, the rate per foot for each section will be based on the total overall height of the tower.

SELF SUPPORTED TOWERS (Triangular Base)
Low Cost Self Supported Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
and
over
         
Light Weight$98$98$109$119$152~~~~~~~~~
Medium Weight$109$109$119$152$164~~~~~~~~~
Heavy Weight$185$164$174$185$195~~~~~~~~~
Self Supported Towers
(CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
Light Weight — No Platform$294$240$272$304$348$413$468$511$587$642$718$772$837$903
Medium Weight — 1 Platform$348$359$413$457$511$577$620$696$739$805$870$925$1 001$1 055
Heavy Weight — 2 or 3 Platforms$413$478$533$609$663$729$794$848$913$979$1 022$1 088$1 143$1 207

Communication Towers — Installed Rates Per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

MONOPOLES
Height in Feet59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
and
over
    
Monopoles, Stepped Pole — No Platform$283$304$348$413$478$533$609$675$739~~~~
Monopoles, Stepped Pole — 1 Platform$511$468$478$511$554$609$663$729$794~~~~
Monopoles, Tapered Pole — No Platform$326$370$435$511$587$663$739$827$913~~~~
Monopoles, Tapered Pole — 1 Platform$577$522$554$609$663$729$805$881$968~~~~
Each additional platform for monopoles (regardless of tower height)$12 377
SUPPORT STRUCTURES & CUSTOM TOWERS for
Radomes, Heavily Loaded Microwave Facilities and Passive Repeaters, Etc.
Structure Frame
(Including foundations)
Rate per cubic foot based on the volume enclosed within the exterior members of each frame.All Sizes
For passive repeaters, do not measure framing in the reflector or between reflector and support structure.$7.39 Per Cu. Ft.

 Schedule A BEFORE re-enacted by BC Reg 244/2017, effective December 20, 2017.

Appendix A

[en. B.C. Reg. 314/2016, s. 5.]

Communication towers — Installed Rates per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

GUYED TOWERS (Triangular Base)
Low Cost Guyed Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
and
over
       
11" and under side dimension$88$88$88$99$99$110$110~~~~~~~
12" to 14" side dimension$99$99$99$110$110$120$143~~~~~~~
15" to 17" side dimension$143$143$143$143$154$154$154~~~~~~~
18" to 23" side dimension$166$154$154$166$166$176$187~~~~~~~
24" to 29" side dimension$187$187$187$197$197$209$220~~~~~~~
30" and over side dimension$242$230$230$230$242$253$275~~~~~~~
Guyed Towers (CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
11" and under side dimension$120$166$176$187$187$197$197$197$209$209$209$209$209$209
12" to 14" side dimension$154$187$209$220$230$230$242$242$242$242$253$253$253$253
15" to 17" side dimension$220$242$253$275$275$286$286$286$286$286$286$286$297$297
18" to 23" side dimension$253$286$286$297$297$297$297$307$307$307$307$307$307$307
24" to 29" side dimension$340$351$363$363$374$374$374$385$385$385$396$396$396$396
30" to 35" side dimension$385$429$439$450$450$462$462$462$462$473$473$473$473$473
36" to 39" side dimension$450$483$495$506$516$516$516$516$527$527$527$527$527$527
40" to 47" side dimension$516$538$538$538$560$560$560$560$560$560$560$560$560$560
48" to 53" side dimension$593$615$636$636$648$648$660$660$660$660$660$660$660$660
54" and over side dimension$725$725$725$725$725$725$725$736$736$736$736$736$736$746

Note: For stepped towers, the rate per foot for each section will be based on the total overall height of the tower.

SELF SUPPORTED TOWERS (Triangular Base)
Low Cost Self Supported Towers
(Non-CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
and
over
         
Light Weight$99$99$110$120$154~~~~~~~~~
Medium Weight$110$110$120$154$166~~~~~~~~~
Heavy Weight$187$166$176$187$197~~~~~~~~~
Self Supported Towers
(CSA)
Height in Feet
59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
to
219'
220'
to
239'
240'
to
259'
260'
to
279'
280'
to
299'
300'
and
over
Light Weight — No Platform$297$242$275$307$351$417$473$516$593$648$725$780$845$912
Medium Weight — 1 Platform$351$363$417$462$516$583$626$703$746$813$879$934$1 011$1 066
Heavy Weight — 2 or 3 Platforms$417$483$538$615$670$736$802$856$922$989$1 032$1 099$1 154$1 219

Communication Towers — Installed Rates Per Foot

Tower Rates Include: Foundations, Supply, Freight, Erection, Paint, Warning Lights, Lightning Rods, Cabling, Connection Devices, Contractor's Mark-up, and Owner's Costs.

Tower Rates Exclude: Antennas, Dishes, Reflectors, Radar, Radomes, Communication Buildings, Interconnecting Cable Tray and Cable Bridges.

MONOPOLES
Height in Feet59'
and
under
60'
to
79'
80'
to
99'
100'
to
119'
120'
to
139'
140'
to
159'
160'
to
179'
180'
to
199'
200'
and
over
    
Monopoles, Stepped Pole — No Platform$286$307$351$417$483$538$615$682$746~~~~
Monopoles, Stepped Pole — 1 Platform$516$473$483$516$560$615$670$736$802~~~~
Monopoles, Tapered Pole — No Platform$329$374$439$516$593$670$746$835$922~~~~
Monopoles, Tapered Pole — 1 Platform$583$527$560$615$670$736$813$890$978~~~~
Each additional platform for monopoles (regardless of tower height)$12 501
SUPPORT STRUCTURES & CUSTOM TOWERS for
Radomes, Heavily Loaded Microwave Facilities and Passive Repeaters, Etc.
Structure Frame
(Including foundations)
Rate per cubic foot based on the volume enclosed within the exterior members of each frame.All Sizes
For passive repeaters, do not measure framing in the reflector or between reflector and support structure.$7.46 Per Cu. Ft.

 Appendix A BEFORE re-enacted by BC Reg 279/2018, effective December 14, 2018.

Appendix A

[en. B.C. Reg. 244/2017, s. 5.]

 Appendix A BEFORE re-enacted by BC Reg 281/2019, effective December 18, 2019.

Appendix A

[en. B.C. Reg. 279/2018, s. 4.]

 Appendix A BEFORE re-enacted by BC Reg 298/2020, effective December 21, 2020.

Appendix A

[en. B.C. Reg. 289/2019, s. 4.]

 Appendix A BEFORE re-enacted by BC Reg 313/2021, effective December 1, 2021.

Appendix A

[en. B.C. Reg. 313/2021, s. 4.]

 Appendix A BEFORE re-enacted by BC Reg 259/2022, effective December 1, 2022.

Appendix A

[en. B.C. Reg. 313/2021, s. 4.]

 Appendix A BEFORE re-enacted by BC Reg 249/2023, effective December 1, 2023.

Appendix A

[en. B.C. Reg. 259/2022, s. 4.]