Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc
B.C. Reg. 239/2012
M167/2012
Deposited August 1, 2012
This consolidation is current to March 18, 2025.
Link to Point in Time

Utilities Commission Act

QCS Exemption Regulation

[includes amendments up to B.C. Reg. 28/2017, February 16, 2017]

Definitions

1   In this regulation:

"Act" means the Utilities Commission Act;

"facilities" means the following facilities located near Fort St. John:

(a) the 9-27-79-17W6 Saturn Compressor Station;

(b) the 04-26-79-17W6M Sunrise Sweet Gas Plant;

"QCS" means QCS ECA 0927 Development Ltd. and its successors and assigns.

[am. B.C. Reg. 28/2017, s. 1.]

Exemption

2   (1) QCS is exempt from Part 3 of the Act in respect of

(a) the construction and operation of a transmission system from the authority’s transmission system to the facilities, and

(b) the provision of service respecting the transmission of electricity from the authority’s transmission system to the facilities.

(2) Despite subsection (1), QCS is not exempt from section 42 of the Act in relation to orders of the commission respecting safety issued to QCS under section 23, 25 or 49 of the Act.

[am. B.C. Reg. 28/2017, s. 2.]

[Provisions relevant to the enactment of this regulation: Utilities Commission Act, R.S.B.C. 1996, c. 473, sections 22 and 125.1 (4) (b)]