Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc

"Point in Time" Regulation Content

Clean Energy Act

Smart Meters and Smart Grid Regulation

B.C. Reg. 368/2010

 Section 1 definition of "eligible premises" BEFORE amended by BC Reg 405/2012, effective December 27, 2012.

"eligible premises" means a building, structure or equipment of a customer of the authority if the building, structure or equipment is connected to the electric distribution system and has an electricity meter;