Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc
B.C. Reg. 97/88
O.C. 506/88
Deposited March 28, 1988
This consolidation is current to December 10, 2024.

Assessment Act

Exemption from Industrial
Improvements Regulation

[includes amendments up to B.C. Reg. 81/2005, March 18, 2005]

Exemptions

1   The industrial improvements in plants or classes of plants described in column 1 of the following Table that have less than the capacities set out opposite them in column 2 are exempt from the definition of "industrial improvements" in section 20 of the Act.

Table

Column 1
Plant
Column 2
Capacity
1Placer mines500 m3 pay dirt per day
2Mines, other than coal mines or placer mines75 tonnes milling capacity per day or no milling capacity
3Sawmills that manufacture lumber and other wood products from raw logs15 million fbm per year based on 480 shifts a year of 8 hours each shift
4Remanufacturing plants, not part of a sawmill, which manufacture lumber or other wood products from rough lumber or cants, but not raw logs300 million fbm per year based on 480 shifts a year of 8 hours each shift
5Chemical plants5 000 tonnes per year
6Building, refitting or repairing ships750 tonnes light displacement weight retrieval capacity or no retrieval capacity
7Specialty veneer value-added remanufacturing plants which are not part of primary veneer processing plants (i.e., where veneer is produced by peeling or slicing raw logs or flitches)250 million sq. ft. 3/8" basis, based on 480 shifts a year of 8 hours each shift

[am. B.C. Regs. 473/92; 329/2002; 460/2003; 81/2005.]

[Provisions of the Assessment Act, R.S.B.C. 1996, c. 20, relevant to the enactment of this regulation: section 20]