Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc

"Point in Time" Regulation Content

Mines Act

Permit Regulation

B.C. Reg. 99/2013

NOTE: Links below go to regulation content as it was prior to the changes made on the effective date. (PIT covers changes made from September 19, 2009 to "current to" date of the regulation.)
SECTIONEFFECTIVE DATE
Section 3 January 25, 2021
Section 4 January 25, 2021
Section 5 January 25, 2021
Section 6 January 25, 2021
Section 7 January 25, 2021
Section 8 January 25, 2021

 Section 3 (1) BEFORE amended by BC Reg 6/2021, effective January 25, 2021.

(1) Despite any provision of this Part, the chief inspector may order that a deemed authorization under this Part does not apply in respect of a particular permit if the chief inspector considers the order necessary to protect health, safety, the environment or a cultural heritage resource.

 Section 4 (a) and (b) BEFORE amended by BC Reg 6/2021, effective January 25, 2021.

(a) be in the form and manner required by the chief inspector, and

(b) include the information required by the chief inspector.

 Section 5 (2) BEFORE amended by BC Reg 6/2021, effective January 25, 2021.

(2) A permittee must give, in accordance with section 4, notice of an intended extension to the chief inspector no less than 30 days before expiry of the permit.

 Section 6 (2) BEFORE amended by BC Reg 6/2021, effective January 25, 2021.

(2) A permittee must give, in accordance with section 4, notice of the intention to conduct an IP survey to the chief inspector no less than 30 days before beginning an IP survey.

 Section 7 (3) BEFORE amended by BC Reg 6/2021, effective January 25, 2021.

(3) A permittee must give, in accordance with section 4, notice of the intention to conduct an exploration drill program or IP survey not otherwise referred to in the permit to the chief inspector no less than 30 days before beginning the exploration drill program or IP survey.

 Section 8 (2) (b) BEFORE amended by BC Reg 6/2021, effective January 25, 2021.

(b) the mine is not within a category prescribed as a reviewable project for the purposes of section 5 of the Environmental Assessment Act.