Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc

“Point in Time” Act Content

FLATHEAD WATERSHED AREA CONSERVATION ACT

[SBC 2011] CHAPTER 20

NOTE: Links below go to act content as it was prior to the changes made on the effective date. (PIT covers changes made from September 6, 2000 to "current to" date of the act.)
SECTIONEFFECTIVE DATE
2September 1, 2013
 August 14, 2020
3September 1, 2023

  Section 2 (4) was added by 2011-27-13, effective September 1, 2013 (BC Reg 99/2013).

  Section 2 (3) (part) BEFORE amended by 2020-15-22, effective August 14, 2020 (Royal Assent).

(3) The chief inspector and the minister under the Mines Act must not, for or in relation to a mining activity in the Flathead watershed area,

  Section 3 BEFORE amended by 2022-42-60,Sch 1 and 2022-42-61,Sch 2, effective September 1, 2023 (BC Reg 187/2023).

Oil and gas activity

3   The Oil and Gas Commission must not issue a permit under section 25 of the Oil and Gas Activities Act in relation to the exploration for and development and production of petroleum, natural gas or both in the Flathead watershed area.