Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc
B.C. Reg. 232/2016
M362/2016
Deposited September 21, 2016
This consolidation is current to March 29, 2022.
See the Cumulative B.C. Regulations Bulletin 2022
for amendments effective after March 29, 2022.

Utilities Commission Act

Long Lake Exemption Regulation

Definitions

1   In this regulation:

"Act" means the Utilities Commission Act;

"Brucejack mine project" means the mine project approximately 65 km north of the District of Stewart;

"Long Lake transmission system" means

(a) the transmission system owned by Long Lake Hydro Limited Partnership, Long Lake Hydro Inc. and Premier Power Corp. on the date this regulation comes into force, and

(b) after the date this regulation comes into force, an extension or reconstruction of the transmission system referred to in paragraph (a);

"parties" means

(a) Long Lake Hydro Limited Partnership and its successors and assigns,

(b) Long Lake Hydro GP Inc. and its successors and assigns,

(c) Long Lake Hydro Inc. and its successors and assigns, and

(d) Premier Power Corp. and its successors and assigns.

Exemptions

2   The parties are exempt from Part 3 of the Act in respect of

(a) the Long Lake transmission system, and

(b) the provision of service respecting the transmission of electricity from the authority's transmission system for the Brucejack mine project via the Long Lake transmission system.

[Provisions relevant to the enactment of this regulation: Utilities Commission Act, R.S.B.C. 1996, c. 473, section 22]