Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc
B.C. Reg. 250/2015
O.C. 807/2015
Deposited December 18, 2015
effective January 1, 2016
This consolidation is current to October 29, 2024.
Link to consolidated regulation (PDF)
Link to Point in Time

Greenhouse Gas Industrial Reporting and Control Act

Emission Offset Project Regulation

[Last amended July 8, 2024 by B.C. Reg. 185/2024]

Contents
1Definition
Part 1
2-10Repealed
Part 2 — Emission Offset Projects
Division 1 — Definitions and Interpretation
11Definitions and interpretation
12Measuring and reporting greenhouse gas amounts
13Validation bodies and verification bodies
Division 2 — Project Plans and Validation
14Project plans
15Validation of project plan
16Conflict of interest — validation bodies
17Acceptance of project plan
18Crediting period
19Revision of project plan
Division 3 — Project Reports and Verification
20Project reports
21Verification of project reports
22Conflict of interest — verification bodies
23Issuance of offset units
24Crediting offset units to contingency account
25Monitoring and maintenance requirements
26Monitoring reports
26.1Reversal events — retirement of compliance units
27Record retention
Part 3
28Repealed
Part 4 — Transition
29Transition — Greenhouse Gas Reduction Targets Act
30Transition — application for grandparented project

Definition

1   In this regulation, "Act" means the Greenhouse Gas Industrial Reporting and Control Act.

Part 1

Repealed

2-10   Repealed. [B.C. Reg. 24/2024, Sch. 2, s. 2.]

Part 2 — Emission Offset Projects

Division 1 — Definitions and Interpretation

Definitions and interpretation

11   (1) In this Part:

"applicable calculation period" means, as applicable,

(a) a project report period, or

(b) a monitoring report period;

"avoidable reversal event" means a reversal event that occurred because the project proponent, by failing to comply with the maintenance requirements, substantially increased the risk that the reversal event would occur;

"baseline emissions", in relation to a project, means the amount of greenhouse gas emissions, established by, or estimated in accordance with, the applicable protocol, that would occur from all selected sources were the project not carried out;

"baseline removals", in relation to a project, means the amount of greenhouse gas, established by, or estimated in accordance with, the applicable protocol, that would be removed from the atmosphere by all selected sinks were the project not carried out;

"baseline scenario", in relation to a project, means one or more hypotheses that

(a) are made on the assumption, among other assumptions, that the project is not carried out,

(b) are about activities that have an effect on greenhouse gas emissions or removals, and

(c) enable the estimation of baseline emissions and baseline removals;

"crediting period", in relation to a project, means the period determined in accordance with section 18 [crediting period];

"emissions reduction" means

(a) in relation to a project plan, baseline emissions minus project emissions described in paragraph (a) of the definition of "project emissions",

(b) in relation to a project report, baseline emissions for the project report period minus project emissions described in paragraph (b) of the definition of "project emissions", and

(c) in relation to a monitoring report, baseline emissions for the monitoring report period minus project emissions described in paragraph (c) of the definition of "project emissions";

"impaired project reduction" means the amount determined under subsection (5), (7) or (8), as applicable;

"ISO" means the International Organization for Standardization;

"leakage", in relation to a project, means any of the following:

(a) increases in greenhouse gas emissions at sources, or decreases of removals at sinks, not selected for the project, which increases or decreases are caused by

(i) shifts in the production of goods or in the provision of services from locations associated with sources or sinks selected for the project to other locations associated with sources or sinks not selected for the project, or

(ii) the production of materials, at a source not selected for the project, that are used at a project site;

(b) increases in greenhouse gas emissions at sources, or decreases of removals at sinks, selected for the project, which increases or decreases are caused by shifts in the levels of production of goods or in the provision of services at sources selected for the project at times outside the crediting period for that project;

(c) any other factor that, were the factor taken into account in determining the emissions reduction or removals enhancement for the project, would have the effect of reducing the emissions reduction or removals enhancement of that project because of activities that occur at sources or sinks not selected for the project;

"maintenance requirements" means any requirements in relation to maintaining emissions reduction and removals enhancement that are set out in the following, as applicable:

(a) a protocol;

(b) a monitoring and maintenance plan referred to in section 14 (3) (o);

(c) a covenant referred to in section 23 (1) (d);

"monitoring period", in relation to a project, means the period determined in accordance with section 25 [monitoring and maintenance requirements];

"monitoring report" means a report prepared in accordance with section 26;

"monitoring report period" means each period of time for which a monitoring report must be prepared;

"project" means an emission offset project referred to in section 9 [emission offset projects] of the Act;

"project emissions" means

(a) in relation to a project plan, the amount of greenhouse gas emissions, estimated in accordance with the applicable protocol, that would occur from all selected sources were the project carried out,

(b) in relation to a project report, the amount of greenhouse gas emissions, determined in accordance with the project plan, that occurred from all selected sources in the project report period, and

(c) in relation to a monitoring report, the amount of greenhouse gas emissions, determined in accordance with the project plan, that occurred from all selected sources in the monitoring report period;

"project plan", in relation to a project, means a plan prepared in accordance with section 14 [project plans];

"project reduction" means

(a) in relation to the crediting period of a project, the total of the emissions reduction and the removals enhancement, less any discounts applied in accordance with the applicable protocol, that are estimated to occur or that have occurred in the crediting period, and

(b) in relation to a project report period of a project, the total of the emissions reduction and the removals enhancement, less any discounts applied in accordance with the applicable protocol, that are estimated to occur or that have occurred in the project report period;

"project removals" means

(a) in relation to a project plan, the amount of greenhouse gas estimated in accordance with the applicable protocol that, were the project carried out, would be removed by all selected sinks,

(b) in relation to a project report, the amount of greenhouse gas, determined in accordance with the project plan, removed by all selected sinks in the project report period, and

(c) in relation to a monitoring report, the amount of greenhouse gas emissions, determined in accordance with the project plan, that was removed by all selected sinks in the monitoring report period;

"project report period" means, subject to the applicable protocol, each period for which a separate project report is or must be prepared;

"project site" means a place where activities described in relation to a project occur;

"protocol" means a protocol established by the director;

"removals" means an amount of greenhouse gas that is

(a) removed from the atmosphere by an industrial or biological process, and

(b) stored or sequestered, or components of which are stored or sequestered, in a reservoir;

"removals enhancement" means

(a) in relation to a project plan, project removals described in paragraph (a) of the definition of "project removals" minus baseline removals for the project,

(b) in relation to a project report, project removals described in paragraph (b) of the definition of "project removals" minus baseline removals for the project report period, and

(c) in relation to a monitoring report, project removals described in paragraph (c) of the definition of "project removals" minus baseline removals for the monitoring report period;

"reservoir" means a physical unit, or component of the biosphere or geosphere, that has the capability to store or accumulate greenhouse gas, or a component of greenhouse gas, removed from the atmosphere;

"reversal event", in relation to a project, means an event or series of events that causes or contributes to circumstances in which the combined total of the emissions reduction for an applicable calculation period and the removals enhancement for that period is less than zero;

"sequestration project" means a project that provides for

(a) storage in a reservoir of greenhouse gas, or a component of greenhouse gas, that is

(i) captured before being emitted into the atmosphere, or

(ii) removed from the atmosphere, or

(b) the avoidance of greenhouse gas emissions from sources that are part of the biosphere;

"sink" means a physical unit or process that removes greenhouse gas from the atmosphere;

"start date", in relation to a project, means

(a) if the applicable protocol describes how the start date of the project is to be determined, the date determined in accordance with that protocol, and

(b) otherwise, the first date on which activities described as part of the project in the accepted project plan for the project occur in relation to the project;

"threat to independence" means a factor that may reasonably be expected to potentially reduce the ability of a validator, validation body, verifier or verification body to fulfill the validator, validation body, verifier or verification body's role in a validation or verification in an ethical, objective and independent manner, and, without limitation, includes the following:

(a) payment for the validation or verification, as applicable, is linked to whether

(i) the validation statement includes the statement referred to in section 15 (5) (d) [validation of project plan], or

(ii) the verification statement includes the statement referred to in section 21 (6) (e) [verification of project reports];

(b) the validator, validation body, verifier, verification body or related persons have a direct or indirect financial interest in a project or persons responsible for carrying out a project;

(c) the validator, validation body, verifier or verification body has designed components of a project's

(i) greenhouse gas monitoring system,

(ii) greenhouse gas inventory,

(iii) greenhouse gas reporting system, or

(iv) data management or information systems on which the systems or inventory described in subparagraphs (i) to (iii) rely;

(d) the validator, validation body, verifier or verification body has with the persons responsible for carrying out a project a familiarity or relationship that decreases appropriate reliance on objective evidence;

(e) the validator, validation body, verifier or verification body has a perception of being intimidated or coerced;

"unavoidable reversal event" means a reversal event that is not an avoidable reversal event;

"validator" means an individual employed or contracted by a validation body, or by a subcontractor of a validation body, for the purpose of conducting a validation;

"verifier" means an individual employed or contracted by a verification body, or by a subcontractor of a verification body, for the purpose of conducting a verification.

(2) In this regulation, a reference to "ISO" followed by a number refers to a standard named in part by that number and made by the ISO, as that standard is amended from time to time.

(3) If there is an inconsistency between this regulation and an ISO standard, this regulation prevails to the extent of the inconsistency.

(4) Section 1 (3) and (4) of the Greenhouse Gas Emission Reporting Regulation applies in relation to this regulation.

(5) The amount of impaired project reduction for a project report period is the amount by which the combined total of the emissions reduction and the removals enhancement for that project report period is less than zero.

(6) For greater certainty, the amount of impaired project reduction for a project report period is deemed to be zero if the combined total of the emissions reduction and the removals enhancement for the project report period is greater than zero.

(7) The amount of impaired project reduction for the first monitoring report period after the crediting period is the amount by which the combined total of the emissions reduction and the removals enhancement for the monitoring report period is less than zero.

(8) The amount of impaired project reduction for a monitoring report period other than the first monitoring report period after the crediting period is determined as follows:

(a) if the combined total of the emissions reduction and the removals enhancement for all previous monitoring report periods is equal to or greater than zero, the amount of impaired project reduction for the monitoring report period is the amount by which the combined total of the following amounts is less than zero:

(i) the emissions reduction and the removals enhancement for the monitoring report period;

(ii) the emissions reduction and the removals enhancement for all previous monitoring report periods;

(b) if the combined total of the emissions reduction and the removals enhancement for all previous monitoring report periods is less than zero, the amount of impaired project reduction for the monitoring report period is the amount by which the combined total of the emissions reduction and the removals enhancement for the monitoring report period is less than zero.

(9) For greater certainty, the amount of impaired project reduction for a monitoring report period is deemed to be zero in each of the following circumstances:

(a) in respect of subsection (7), the combined total of the emissions reduction and the removals enhancement for the monitoring report period is greater than zero;

(b) in respect of subsection (8) (a), the combined total of the amounts described in subparagraphs (i) and (ii) of that paragraph is greater than zero;

(c) in respect of subsection (8) (b), the combined total of the emissions reduction and the removals enhancement for the monitoring report period is greater than zero.

[am. B.C. Regs. 64/2021, s. 3; 169/2023, Sch., ss. 1 and 2; 24/2024; Sch. 2, s. 3.]

Measuring and reporting greenhouse gas amounts

12   All greenhouse gas amounts to be measured or reported under this Part must be documented and reported in tonnes of carbon dioxide equivalent.

Validation bodies and verification bodies

13   (1) A person is qualified as a validation body or a verification body for a project in a sector if the person is accredited in relation to projects in the sector by, and is in good standing with, a member of the International Accreditation Forum, in accordance with ISO 14065 through a program developed under ISO 17011.

(2) A person is not qualified to act as a verification body in relation to a project report if the person has performed verifications of project reports for the same accepted emission offset project for 6 of the 9 most recent project reports for that project.

(3) A verification body that is also a validation body may not verify or provide a verification statement in relation to a project report for a project if the verification body provided a validation statement in respect of the project plan for the project unless at least 2 verification statements for successive project report periods for that project have been submitted by another verification body.

(4) The director may refuse to accept a validation statement or verification statement if

(a) the validation body or verification body is under investigation by the member of the International Accreditation Forum that accredited the validation body or verification body, as applicable, or

(b) the director believes on reasonable grounds that validations performed by the validation body or verifications performed by the verification body do not comply with this regulation or the standards of the member of the International Accreditation Forum that accredited the validation body or verification body, as applicable.

(5) A validation body or verification body that is under investigation by the member of the International Accreditation Forum that accredited it must immediately give notice of the investigation to the director and any project proponent

(a) in respect of which a validation of a project plan or a verification of a project report is in progress, or

(b) who requests that the validation body perform a validation of a project plan or a verification of a project report.

Division 2 — Project Plans and Validation

Project plans

14   (1) A project proponent who wishes to have a project accepted by the director under section 9 (1) [emission offset projects] of the Act must

(a) prepare a project plan in a form approved by the director, and

(b) submit the project plan to a validation body for review under section 15 of this regulation.

(2) A validated project plan must be submitted in a manner approved by the director.

(3) Subject to the applicable protocol, a project plan must include all of the following:

(a) the title of the project;

(b) the name and address of the project proponent;

(c) the purpose and object of the project, including a technical description of the project and an explanation of how it will achieve a project reduction;

(d) project identification information, including geographical information about the location where the project will be carried out and where the project reductions will occur, both of which must be in British Columbia, and any other uniquely identifying information for the project;

(e) the chronological plan for the project, setting out key events in the development of the project plan and the project and the dates those events are to occur;

(f) the length of the project's crediting period;

(g) the title and date of the protocol that applies to the project and an assertion that the protocol is applicable to the project;

(h) a description of the baseline scenario for the project and how it was established or developed;

(i) identification of the sources, sinks and reservoirs selected for the project and an explanation of why those sources, sinks and reservoirs were selected;

(j) for each selected source, sink and reservoir,

(i) a description of the methods that are to be used

(A) to make estimates or measurements for the purposes of calculating emissions reduction and removals enhancement, and

(B) to undertake relevant data collection and monitoring, including a description of quality assurance and quality control provisions that are to be complied with,

(ii) a description of the frequencies at which measurement and monitoring will be undertaken, and

(iii) a justification for the use of the methods described in subparagraph (i) and the frequencies described in subparagraph (ii);

(k) in respect of leakage,

(i) a description of all types of leakage that would reasonably be expected to have a material effect on the project's emissions reduction or removals enhancement,

(ii) an assessment of the extent to which carrying out the project will result in such leakage, and

(iii) a description of the discounts that will be applied to the emissions reduction and removals enhancement to account for such leakage;

(l) the project reduction expected to be achieved by the project during its crediting period and identification of

(i) the basis, including from the applicable protocol, on which the project emissions and project removals were estimated for the project plan, and

(ii) the formulas from the applicable protocol that will be used to calculate the project reduction for each report period;

(m) a description of the evidence of the property rights or contractual rights held by the project proponent that establish the rights described in paragraph (n) (ix) and (x);

(n) the following assertions of the project proponent:

(i) if activities described as part of the project in the project plan have started in relation to the project, that the date those activities started was after January 1, 2014;

(ii) that the project plan meets the requirements of this regulation;

(iii) that neither the emissions reduction nor the removals enhancement projected in the project plan has been or will be

(A) applied in relation to a regulatory requirement under another enactment, or

(B) submitted for recognition under another emission offset recognition scheme;

(iv) if the project proponent has regulatory requirements that the proponent must meet in relation to greenhouse gas emissions, that the project reduction will be in excess of those regulatory requirements;

(v) that the baseline scenario described under paragraph (h) is the baseline scenario established by or developed in accordance with the applicable protocol and results in a conservative estimate of the project reduction, taking into account

(A) Provincial or federal incentives or regulatory requirements relevant to any aspect of the baseline scenario, including tax incentives and grants,

(B) financial implications of carrying out a course of action referred to in the baseline scenario, and

(C) any other factor relevant to justifying the assertion that the estimate of the project reduction is conservative;

(vi) that the following are consistent with the applicable protocol:

(A) the proponent's selection of sources, sinks and reservoirs;

(B) the methods and frequencies referred to in paragraph (j);

(vii) that using

(A) the sources, sinks and reservoirs identified under paragraph (i), and

(B) the methods referred to in paragraph (j) (i)

will ensure that the project reduction referred to in paragraph (l) is a conservative estimate of the project reduction that will be achieved and to which the project proponent is entitled as described in subparagraph (ix) (B);

(viii) that the emissions reduction and removals enhancement will be discounted as described in paragraph (k) (iii) and as required by the applicable protocol;

(ix) that the project proponent has acquired the following rights from every other person who could reasonably have a claim to those rights:

(A) the entitlement to submit the project plan to the director;

(B) the entitlement to offset units or any other benefit issued in respect of the project's project reduction;

(x) in relation to a sequestration project, that the project proponent has secured a right of access to the project site for the monitoring period required under the protocol;

(xi) that there are financial, technological or other obstacles to carrying out the project that are overcome or partially overcome by the incentive of having the project reduction recognized as offset units under the Act, and a justification for the assertion;

(o) in the case of a sequestration project, a monitoring and maintenance plan in accordance with the applicable protocol;

(p) anything else required by an applicable protocol.

[am. B.C. Reg. 24/2024, Sch. 2, s. 4.]

Validation of project plan

15   (1) Subject to subsections (2) to (4), a validation body may validate a project plan and provide a validation statement in accordance with subsection (5) only if the validation body is satisfied that

(a) the assertions in the project plan are fair and reasonable, and

(b) the project plan is consistent with the applicable protocol and this regulation.

(2) A validation body may not provide a validation statement under subsection (1) unless the validation body considers that the project plan is not subject to material errors, omissions or misrepresentations.

(3) For the purposes of subsection (2), a project plan is subject to material errors, omissions or misrepresentations if

(a) the aggregate or individual effects of errors, omissions or misrepresentations related to the project plan make it probable that a validation body acting reasonably would not validate the project plan,

(b) the aggregate or individual effects of errors, omissions or misrepresentations related to the project plan make it probable that the director, if informed of the errors, omissions or misrepresentations and acting reasonably, would not rely on the validation, or

(c) the errors, omissions or misrepresentations are material as determined in accordance with the applicable protocol.

(4) A validation body may validate a project plan only in a manner consistent with ISO 14064-3 and in accordance with the Act and this regulation.

(5) A validation under subsection (1) is made when a member of the validation body signs a validation statement that includes all of the following:

(a) the name, address and other contact information for the validation body;

(b) the date of the validation statement;

(c) the title of the project;

(d) a statement that the validation is made in a manner consistent with ISO 14064-3 and in accordance with the Act and this regulation;

(e) a description of the work the validation body performed to validate the plan, including a description of

(i) the techniques and processes used to evaluate the assertions in the project plan, and

(ii) any additional information, not in the project plan, used by the validation body in the course of making the validation;

(f) the date and location of any visits to the project site;

(g) a statement that the validation body is satisfied that the project plan is fair and reasonable;

(h) an assertion that the person signing the validation statement is or represents a validation body;

(i) identification of any relevant accreditation held by the validation body;

(j) a description of the quality assurance, quality control, record keeping and data management procedures used by the validation body and of those used by the project proponent;

(k) a statement that the validation body, before validating the project plan, complied with section 16;

(l) anything else required by the applicable protocol.

(6) For certainty, nothing in this regulation requires a validation body to express an opinion referred to in this section.

Conflict of interest — validation bodies

16   (1) Subject to subsection (2), a validation body, must, before performing a validation under section 15, ensure that it is free of or has in place procedures to mitigate any potential threat to independence in relation to the validation.

(2) A validation body that is not free of any potential threat to independence in relation to a project may validate the project plan if, before making the validation, it establishes and documents procedures for mitigating any threat to independence, and during the validation process follows those procedures, such that a reasonable person would conclude that the potential for the threat to independence to influence the objectivity of the validation is insignificant.

(3) Before providing a validation statement under section 15 (5), a validation body must prepare a report that

(a) includes

(i) a description of an assessment of threats to independence in relation to the project plan,

(ii) if applicable, procedures for mitigating threats to independence, and

(iii) if applicable, a report on implementation of the procedures referred to in subparagraph (ii), and

(b) affirms that

(i) the validation body avoided any actual or potential conflicts of interest with the project proponent and with any person it is reasonable to expect may rely on the validation statement, and

(ii) no person involved in the validation was involved in the development of the project plan.

Acceptance of project plan

17   (1) A validation body submitting a project plan and validation statement respecting the project plan must include the report described in section 16 (3).

(2) The director may refuse to accept a project plan in the following circumstances:

(a) the validation statement in respect of the project plan was signed more than 45 days before the date the statement is submitted to the director;

(b) the participation of the project proponent in the registry is suspended or cancelled;

(c) the project plan is inconsistent with the applicable protocol, the Act or this regulation;

(d) the validation body is under investigation by the member of the International Accreditation Forum that accredited the validation body.

Crediting period

18   (1) The crediting period for an accepted emission offset project

(a) begins on the earlier of the following:

(i) the date the project plan is accepted by the director;

(ii) the project's start date, and

(b) ends on the earlier of the following:

(i) the last day of the crediting period, if any, specified in the applicable protocol;

(ii) as applicable,

(A) if the project is a sequestration project, 25 years after the applicable date under paragraph (a), or

(B) if the project is not a sequestration project, 10 years after the applicable date under paragraph (a).

(2) The project proponent may apply to the director, within the 12-month period before the expiry of a crediting period, for an extension of the crediting period for a project to which subsection (1) (b) (ii) applies by submitting to the director, in a manner and within a period acceptable to the director,

(a) a new project plan in accordance with the applicable protocol, but, if that protocol has been amended or replaced since the project plan was last validated, in accordance with that amended or replacement protocol,

(b) identification of and an explanation for the differences between the new project plan and the project plan for the accepted emission offset project, and

(c) a new validation statement and a conflict of interest report under section 16 (3).

(3) The director may authorize an extension of the crediting period for a project to which subsection (1) (b) (ii) applies, but

(a) if the project is a sequestration project, the extension may not be for more than 25 years and the total crediting period may not exceed 100 years, and

(b) if the project is any other kind of project, the extension may not exceed 10 years and the total crediting period may not exceed 20 years.

[am. B.C. Reg. 24/2024, Sch. 2, s. 5.]

Revision of project plan

19   (1) A proponent of an accepted emission offset project may apply to the director for an amendment to the project plan, other than to the crediting period, by submitting to the director

(a) an amended project plan,

(b) a description of and explanation for the requested amendment,

(c) an assessment of whether

(i) the amendment is consistent with the protocol under which the project was validated, and

(ii) there has been a change in an enactment of British Columbia, or Canada, or in other circumstances, affecting the project's baseline scenario, and

(d) a new validation statement and a conflict of interest report under section 16 (3)

(i) if there has been a change described in paragraph (c) (ii) that has had a material impact on the project's project reduction, or

(ii) if required by the director, in accordance with any directions given by the director.

(2) On receiving an application under subsection (1), the director may approve or reject the amendment that is the subject of the application.

(3) If under subsection (2) the director rejects an amendment, the project proponent must notify the director within the time specified by the director whether the proponent intends to carry out the project as registered.

Division 3 — Project Reports and Verification

Project reports

20   (1) A project proponent who wishes to have offset units issued under section 8 (1) [offset units] of the Act for a project report period of the project must

(a) prepare a project report in a form approved by the director, and

(b) submit the project report to a verification body for review under section 21.

(2) A verified project report must be submitted in a manner approved by the director.

(3) A project report must contain all of the following:

(a) the title of the accepted emission offset project;

(b) the project report period the report covers;

(c) identification of any changes in information provided under section 14 (3) [project plans] that have occurred since the project plan was accepted;

(d) further project identification information, described in section 14 (3) (d), that was not determinable when the project plan was validated;

(e) calculations supporting the amounts asserted in paragraph (f) (v), including separate calculations for each selected source or sink;

(e.1) if the project is a sequestration project, a description of each reversal event that occurred during the project report period;

(f) the following assertions by the project proponent:

(i) the project's start date;

(ii) that the period covered by the report is within the crediting period;

(iii) that the project report period reported under paragraph (b) is consistent with the project report period under the applicable protocol;

(iv) that the project was carried out substantially as described in the accepted project plan;

(v) the amount of each of the following, as applicable, calculated for the project report period:

(A) project reduction described in paragraph (b) of the definition of that term in section 11 [definitions and interpretation];

(B) project emissions described in paragraph (b) of the definition of that term in section 11;

(C) emissions reduction described in paragraph (b) of the definition of that term in section 11;

(D) project removals described in paragraph (b) of the definition of that term in section 11;

(E) removals enhancement described in paragraph (b) of the definition of that term in section 11;

(F) if the project is a sequestration project, the amount of impaired project reduction;

(v.1) the total amount of the emissions reduction and the removals enhancement for all project report periods prior to the project report period to which the project report relates;

(vi) that the measurements and calculations that resulted in the amounts asserted under subparagraphs (v) and (v.1) were carried out in accordance with the applicable protocol;

(vi.1) the total number of offset units issued in relation to the emissions offset project;

(vii) that the project proponent is entitled, as described in section 14 (3) (n) (ix) (B), to offset units from the project for the project report period;

(viii) that neither the emissions reduction nor the removals enhancement asserted in the project report has been or will be

(A) applied in relation to a regulatory requirement under another enactment, or

(B) submitted for recognition under another emission offset recognition scheme;

(ix) the number of offset units the project proponent claims the project has generated in the report period and the number of those offset units, if any, that are to be credited to a contingency account in accordance with the applicable protocol;

(x) that the project report complies with this regulation;

(f.1) if the project is a sequestration project, and if a reversal event occurred during the project report period,

(i) a description of the cause of the reversal event,

(ii) a statement as to whether, in the opinion of the project proponent, the reversal event was an avoidable reversal event, an unavoidable reversal event, or a combination of an avoidable reversal event and an unavoidable reversal event,

(iii) an explanation of the basis for the statement referred to in subparagraph (ii), and

(iv) if, in the statement referred to in subparagraph (ii), the project proponent states that a reversal event was a combination of an avoidable reversal event and an unavoidable reversal event, specification of the amount of impaired project reduction that is attributable to the avoidable reversal event;

(g) anything else required by the applicable protocol.

(4) The project proponent must, if requested to do so by the director, provide additional information to the director in relation to any reversal event described in a project report.

[am. B.C. Regs. 169/2023, Sch., ss. 3 and 4; 185/2024, Sch. 2, s. 1.]

Verification of project reports

21   (1) Subject to subsections (3) to (5), a verification body may verify a project report and provide a verification statement in accordance with subsection (5) only if the verification body is satisfied that

(a) the assertions in the project report respecting the project reduction are fair and reasonable,

(b) there were no substantial changes in how the project was carried out during the project report period as compared to the description of that project in the project plan, and

(c) the verification statement contains as few qualifications as possible.

(2) For the purposes of subsection (1), the project proponent must

(a) exercise due diligence in order to minimize the potential for qualifications,

(b) provide a verification body retained by the project proponent with full and timely access to all records relevant to the verification, and

(c) if necessary and consistent with this regulation, make such revisions to the project report as are needed to minimize or eliminate qualifications.

(3) A verification body may not provide a verification statement under subsection (1) if the verification body considers that the project report is subject to material errors, omissions or misrepresentations.

(4) For the purposes of subsection (3), a project report is subject to material errors, omissions or misrepresentations if

(a) the aggregate or individual effects of errors, omissions or misrepresentations related to the project report make it probable that a verification body acting reasonably would not verify the project report,

(b) the aggregate or individual effects of errors, omissions or misrepresentations related to the project report make it probable that the director, if informed of the errors, omissions or misrepresentations and acting reasonably, would not rely on the verification, or

(c) the errors, omissions or misrepresentations are material as determined in accordance with the applicable protocol.

(5) A verification body may verify a project report only in a manner consistent with ISO 14064-3 and in accordance with this regulation.

(6) A verification under subsection (1) is made when a member of the verification body signs a verification statement that includes all of the following:

(a) the name, address and other contact information for the verification body;

(b) the date of the verification statement;

(c) the title of the project;

(d) the first and last date of the project report period to which the report relates;

(e) a statement that the verification is made in a manner consistent with ISO 14064-3 and in accordance with the Act and this regulation;

(f) verification of the calculation of the amounts, and those amounts, asserted under section 20 (3) (f) (v) and (ix);

(g) a statement that the verification body is satisfied that the assertions in the project report respecting the project reduction are fair and accurate;

(h) a description of the work the verification body performed to verify the project report, including a description of

(i) the techniques and processes used to evaluate the assertions in the project report, and

(ii) any additional information, not in the project report, used by the verification body in the course of making the verification;

(i) the date and location of any visits to the project site;

(j) an assertion that the person signing the verification statement is or represents a verification body;

(k) identification of any relevant accreditation held by the verification body;

(l) a description of the quality assurance and quality control, record keeping and data management procedures used by the verification body and of those used by the project proponent;

(m) a statement that the verification body, before verifying the project report, complied with section 22;

(n) anything else required by the applicable protocol.

(7) For certainty, nothing in this regulation requires a verification body to express an opinion referred to in this section.

[am. B.C. Reg. 169/2023, Sch., s. 5.]

Conflict of interest — verification bodies

22   (1) Subject to subsection (2), a verification body must, before performing a verification under section 21, ensure that it is free of or has in place procedures to mitigate any potential threat to independence in relation to the verification.

(2) A verification body that is not free of any potential threat to independence in relation to a project may verify a project report if, before making the verification, it establishes and documents procedures for mitigating any threat to independence, and during the verification follows those procedures, such that a reasonable person would conclude that the potential for a threat to independence is insignificant.

(3) Before providing a verification statement under section 21 (6) in respect of a project report, a verification body must prepare a report that

(a) includes

(i) a description of an assessment of threats to independence in relation to the project report,

(ii) if applicable, procedures for mitigating threats to independence, and

(iii) if applicable, a report on implementation of the procedures referred to in subparagraph (ii), and

(b) affirms that

(i) the verification body avoided any actual or potential conflicts of interest with the project proponent and with any person it is reasonable to expect may rely on the verification statement, and

(ii) no person involved in the verification was involved in the development of the project report.

(4) A verification body that provides a verification statement must provide the report under subsection (3) with the verification statement.

Issuance of offset units

23   (1) An application to the director for the issuance of offset units in relation to a project report must, subject to subsection (1.1), be submitted to the director by the verification body that prepared the verification statement for the project report in a manner acceptable to the director and include all of the following:

(a) the project report prepared under section 20 [project reports];

(b) the verification statement prepared under section 21 [verification of project reports];

(c) the conflict of interest report prepared under section 22;

(d) if required by the applicable protocol, evidence that a covenant under section 219 of the Land Title Act, applicable to the project site and containing the provisions specified in the applicable protocol, has been entered into in favour of the Crown.

(1.1) If a project is a sequestration project, the project report and the verification statement referred to in subsection (1) (a) must cover the project report period to which the application relates and every project report period prior to the project report period to which the application relates.

(2) The director may refuse to issue offset units in relation to the project report in the following circumstances:

(a) the project report or verification statement is inconsistent with the Act, this regulation or the applicable protocol;

(b) the verification body is under investigation by the member of the International Accreditation Forum that accredited the verification body;

(c) the participation of the project proponent in the registry has been suspended or cancelled.

[am. B.C. Regs. 169/2023, Sch., s. 6; 24/2024, Sch. 2, s. 6.]

Crediting offset units to contingency account

24   (1) Repealed. [B.C. Reg. 185/2024, Sch. 2, s. 2 (a).]

(2) Subject to subsection (3), a protocol may require that up to 51% of offset units issued in relation to a sequestration project must be credited to a contingency account.

(3) If the director retires offset units from a contingency account under section 13 (5) (c) of the BC Carbon Registry Regulation in relation to a sequestration project, the director may, subject to subsection (4) of this section, credit to a contingency account any offset units that would otherwise be credited to the holding account of the project proponent during the crediting period.

(4) The number of offset units that may be credited to a contingency account under subsection (3) of this section must not exceed the number of offset units that were retired from a contingency account under section 13 (5) (c) of the BC Carbon Registry Regulation.

[am. B.C. Regs. 169/2023, Sch., s. 7; 24/2024, Sch. 2, s. 7; 185/2024, Sch. 2, s. 2.]

Monitoring and maintenance requirements

25   (1) The monitoring period for a sequestration project

(a) begins on the day after the crediting period for the project ends, and

(b) ends on the earlier of the following:

(i) the last day of the monitoring period, if any, specified in the applicable protocol;

(ii) 100 years after the crediting period for the project ends.

(2) The proponent of a sequestration project must ensure that, for the duration of the monitoring period,

(a) the project site is monitored at the frequency and in the manner specified in the applicable protocol and the monitoring and maintenance plan referred to in section 14 (3) (o) [project plans], and

(b) the amount of greenhouse gas, or components of greenhouse gas, sequestered or stored, as applicable, is maintained, and the maintenance activities are carried out, in accordance with the maintenance requirements.

[am. B.C. Regs. 169/2023, Sch., s. 8; 24/2024, Sch. 2, s. 8.]

Monitoring reports

26   (1) The proponent of a sequestration project must, within 6 months after the end of each monitoring report period required under the protocol,

(a) prepare a monitoring report in accordance with subsection (3) for each monitoring report period, and

(b) submit the monitoring report to a verification body for verification in accordance with subsection (5).

(2) The monitoring report and verification statement must be submitted to the director by the verification body that verifies the monitoring report.

(3) A monitoring report must include all of the following:

(a) the title of the accepted emission offset project;

(b) specification of the monitoring report period;

(c) a description of maintenance requirements and an assertion that the maintenance requirements were carried out;

(d) a description of the monitoring activities required under the project plan and an assertion that those monitoring activities were carried out in accordance with that project plan;

(d.1) if the project is a sequestration project, a description of each reversal event that occurred during the monitoring report period;

(e) if the project is a sequestration project, an assertion of the amount of each of the following, as applicable:

(i) the emissions reduction during the monitoring report period;

(ii) the removals enhancement during the monitoring report period;

(iii) the amount of any impaired project reduction during the monitoring report period and the numbers that were used to calculate that amount;

(iv) the total number of offset units issued in relation to the emissions offset project;

(e.1) if the project is a sequestration project, an assertion that the measurements and calculations that resulted in the amounts asserted under paragraph (e) were carried out in accordance with the applicable protocol;

(f) if the project is a sequestration project, and if a reversal event occurred during the monitoring report period,

(i) a description of the cause of the reversal event,

(ii) a statement as to whether, in the opinion of the project proponent, the reversal event was an avoidable reversal event, an unavoidable reversal event, or a combination of an avoidable reversal event and an unavoidable reversal event,

(iii) an explanation of the basis for the opinion referred to in subparagraph (ii), and

(iv) if, in the statement referred to in subparagraph (ii), the project proponent states that a reversal event was a combination of an avoidable reversal event and an unavoidable reversal event, specification of the amount of impaired project reduction that is attributable to the avoidable reversal event;

(g) evidence to support the assertions, descriptions and statements referred to in paragraphs (c) to (f);

(h) an assertion that the monitoring report complies with the applicable protocol and this regulation;

(i) anything else required by the applicable protocol.

(3.1) The project proponent must, if requested to do so by the director, provide additional information to the director in relation to any reversal event described in a monitoring report.

(4) and (5) Repealed. [B.C. Reg. 169/2023, Sch., s. 9 (j).]

(6) Section 21 (1) to (5) and (6) (a) and (b) [verification of project reports] applies in relation to the verification of a monitoring report and, for that purpose, a reference in section 21 to a project report must be read as a reference to the monitoring report.

[am. B.C. Regs. 169/2023, Sch., s. 9; 24/2024, Sch. 2, s. 9.]

Reversal events — retirement of compliance units

26.1   (1) When the director receives a project report or a monitoring report stating that a reversal event occurred during the project report period or the monitoring report period, as applicable, the director may do one of the following:

(a) rely in whole or in part on the project proponent's statement respecting the amount of impaired project reduction that is attributable to an avoidable reversal event, and retire from a holding account of the project proponent compliance units sufficient to compensate for that impaired project reduction;

(b) make a determination respecting the amount of impaired project reduction that is attributable to an avoidable reversal event, which determination may differ from the project proponent's statement, and retire from a holding account of the project proponent compliance units sufficient to compensate for the amount of impaired project reduction determined by the director.

(2) If the number of compliance units in a holding account of a project proponent is less than the number of compliance units that are to be retired by the director under subsection (1) (a) or (b), as applicable,

(a) the project proponent must, no later than 60 days after receiving written notice from the director, deposit to a holding account of the project proponent the number of additional compliance units that are specified in the notice, and

(b) the director must retire all of the compliance units that are specified in the notice.

(3) When making a determination under subsection (1) (b), the director may do one or both of the following:

(a) deem any number of reversal events reported by a project proponent to be a single reversal event;

(b) deem a reversal event reported by a project proponent to be comprised of any number of discrete reversal events.

[en. B.C. Reg. 169/2023, Sch., s. 10.]

Record retention

27   (1) A project proponent must retain all records related to an accepted emission offset project or project reports for a period of at least 7 years after the later of the following dates:

(a) the last day of the crediting period for the project;

(b) if monitoring of the project is required after the crediting period has ended, the last day of the monitoring period.

(2) Records referred to in subsection (1) include, but are not limited to, the following records:

(a) all records used to quantify emissions reductions, removals enhancements and project reductions in relation to the project or supporting other information reported in the project report, including invoice records, monitoring equipment output or other activity data;

(b) all records used in preparation of the project plan;

(c) records of any calculations and methods used to quantify emissions reductions, removals enhancements and project reductions;

(d) records of all emission factors used to quantify emissions reductions, removals enhancements and project reductions;

(e) all records submitted to the director under this regulation;

(f) names, job titles and contact information of the proponent and any other person responsible for carrying out the project, the person primarily responsible for preparing and submitting the project plan, a project report or a monitoring report and other personnel involved in quantifying emissions reductions, removals enhancements and project reductions or involved in quality assurance;

(g) records indicating the role, in relation to the project, of each individual referred to in paragraph (f);

(h) a log that must be prepared for each project report period, documenting any changes in calculations and methods and instrumentation used to quantify emissions reductions, removals enhancements and project reductions;

(i) all records respecting any revisions, and reasons for those revisions, to the project plan, project reports or monitoring reports;

(j) all records related to the validation of the project plan and verification of the project reports and monitoring reports.

(3) The documents and records referred to in subsections (1) and (2) must be sufficient to allow for the validation of the project plan, the verification of a project report or the verification of a monitoring report.

(4) On request, a proponent must provide to the director any documents and records referred to in subsection (1) within 10 business days after the request is made.

Part 3

Repealed

28   Repealed. [B.C. Reg. 24/2024, Sch. 2, s. 10.]

Part 4 — Transition

Transition — Greenhouse Gas Reduction Targets Act

29   Despite section 18 [crediting period], the crediting period for a project accepted under section 54 (1) of the Act is the period described as the validation period as defined in section 1 (1) of the Emission Offsets Regulation as it read immediately before its repeal.

Transition — application for grandparented project

30   A request under section 54 (1) [transition — Greenhouse Gas Reduction Targets Act] of the Act must be made on or before June 30, 2016.

[Provisions relevant to the enactment of this regulation: Greenhouse Gas Industrial Reporting and Control Act, S.B.C. 2014, c. 29, ss. 46, 48, 49, 50 and 53.]