Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc
This is part of an archived regulation consolidation that is current to January 14, 2011 and includes changes enacted and in force by that date.

"Point in Time" Regulation Content

FOREST AND RANGE PRACTICES ACT

Forest Planning and Pracitces Regulation

B.C. Reg. 14/2004

NOTE: Links below go to reg content as it was prior to the changes made on the effective date. (PIT covers changes made from September 19, 2009 to January 14, 2011)
SECTION EFFECTIVE DATE
Section 1 October 22, 2009
  October 4, 2010
  October 4, 2010
Section 8.2 October 22, 2009
Section 12.1 October 22, 2009
Section 12.3 October 22, 2009
Section 51 October 4, 2010

 Section 1 (1) definitions of "result" and "strategy" BEFORE repealed by BC Reg 240/2009 effective October 22, 2009.

"result" means a description of

(a) measurable or verifiable outcomes in respect of a particular established objective, and

(b) the situations or circumstances that determine where in a forest development unit the outcomes under paragraph (a) will be applied;

"strategy" means a description of

(a) measurable or verifiable steps or practices that will be carried out in respect of a particular established objective, and

(b) the situations or circumstances that determine where in a forest development unit the steps or practices will be applied;

 Section 1 (2) definitions of "result" and "strategy" were added by BC Reg 240/2009 effective October 22, 2009.

 Section 1 (1) definition of "authorized in respect of a road" subparagraph (c)(i) BEFORE amended by BC Reg 269/2010 effective October 4, 2010.

(i)  the Transportation Act, Land Act, Local Government Act or Pipeline Act, or

 Section 1 (1) definition of "road" subparagraph (c)(i) BEFORE amended by BC Reg 269/2010 effective October 4, 2010.

(i)  the Community Charter, Transportation Act, Land Act, Local Government Act or Pipeline Act, or

 Section 8.2 (2)(a) BEFORE amended by BC Reg 240/2009 effective October 22, 2009.

(a) a material adverse impact on the quantity of water or the timing of the flow of the water from the waterworks, or

 Section 12.1 (7)(part) BEFORE amended by BC Reg 240/2009 effective October 22, 2009.

(7)  A timber sales manager who is required to prepare a forest stewardship plan is exempt for that plan from the requirement under section 5 of the Act that the plan specify intended results or strategies in relation to the objective for biodiversity at the landscape level set out in section 9 of this regulation if the timber sales manager

 Section 12.3 (7.1) was enacted by BC Reg 240/2009 effective October 22, 2009.

 Section 51 (1)(h) BEFORE amended by BC Reg 269/2010 effective October 4, 2010.

(h) felling or modifying a tree under an occupant licence to cut, master licence to cut or free use permit issued in respect of an area that is subject to a licence, permit, or other form of tenure issued under the Land Act, Coal Act, Geothermal Resources Act, Mines Act, Mineral Tenure Act, Mining Right of Way Act, Ministry of Lands, Parks and Housing Act, Petroleum and Natural Gas Act or Pipeline Act, if the felling or modification is for a purpose expressly authorized under that licence, permit or tenure;